    User name Bo

    Log entry time 00:06:27 on November 9,2009

    Entry number 298457

    keyword=Shift summary

    SL: B. Zhao
    TO: J. Huang
    3rd: S. Gogle
    (Due to an machine reboot to fix the DAQ problem, my shift summary was killed accidently. This is a simple one)

    16:00 take over the shift. Bob etc. are in the Hall, trying to fix the DAQ problem.
    17:20 all the works in the Hall are done. Call MCC to go to beam permit.
    17:40 Following the beam recovery procedure, restore the beam to the Hall.
    19:05 start production run at 100 uA.
    20:30 start compton tuning. Move target to Empty.
    20:40 Q1, Q3 and Dipole in R-arm are down. Reset and ramp them up. Happex DAQ also crashed. Alexandre, Ramesh and Kai are working on it.
    23:40 Call MCC to ask for a controlled access. Ramesh will go to the hall to fix R-arm triggers.