• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name adaq

    Log entry time 08:01:06 on November 10, 2009

    Entry number 298739

    keyword=Beam Time Accounting
    Hall A

    11/10/09 0000-0800
    Experiment #: E08-011
    Shift Leader: David Flay
    Shift Workers: Matthew Posik (TO), Li Ye (3rd)

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    0.000.250.500.750.830.921.000.584.84
    Beam Available
    but Not in Use
    1.000.670.000.000.000.000.000.332.00
    Beam Not Available
    or Unacceptable
    0.000.080.500.250.170.080.000.081.16
    Accelerator Con-
    figuration Change
    0.000.000.000.000.000.000.000.000.00
    Experiment
    Ready
    0.000.250.500.750.830.921.000.584.83
    Planned Config-
    uration Change
    0.000.000.000.000.000.000.000.000.00
    Unplanned
    Experiment Down
    1.000.750.500.250.170.080.000.423.17
    Hall not
    ready reasons
    Target1.000.670.000.000.000.000.000.001.67
    Data Acq0.000.000.000.000.000.000.000.000.00
    Other0.000.080.500.250.170.080.000.081.17
    HRSL0.000.000.000.000.000.000.000.000.00
    HRSR0.000.000.000.000.000.000.000.330.33
    HALL_OFF0.000.000.000.000.000.000.000.000.00

    Comments: 00:25 Target alarm due to temperature fluctuation; trying to slowly bring beam back 01:25 Target is responding well to slow ramping up of beam -- currently at 100 uA 01:45 Target has PID issues at 100 uA. Target alarm goes off. We've decided to run at 90 uA beam for production (see HALOG 298690,298691) 02:30 Multiple beam trips causing target alarm for past 20 mins. 04:00 Production at I ~ 90 uA running smoothly 06:46 Smooth data taking all night, up until LHRS coda crash -- no response from TS. (See HALOG 298727.) 08:00 RHRS Q2 Liquid He level is low; calling tech-on-call to help fix the problem.

    Data Entry by: David Flay