0000 | 0100 | 0200 | 0300 | 0400 | 0500 | 0600 | 0700 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0.00 | 0.25 | 0.50 | 0.75 | 0.83 | 0.92 | 1.00 | 0.58 | 4.84 |
Beam Available but Not in Use | 1.00 | 0.67 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.33 | 2.00 |
Beam Not Available or Unacceptable | 0.00 | 0.08 | 0.50 | 0.25 | 0.17 | 0.08 | 0.00 | 0.08 | 1.16 |
Accelerator Con- figuration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Experiment Ready | 0.00 | 0.25 | 0.50 | 0.75 | 0.83 | 0.92 | 1.00 | 0.58 | 4.83 |
Planned Config- uration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Unplanned Experiment Down | 1.00 | 0.75 | 0.50 | 0.25 | 0.17 | 0.08 | 0.00 | 0.42 | 3.17 |
Hall not ready reasons | |||||||||
Target | 1.00 | 0.67 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 1.67 |
Data Acq | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Other | 0.00 | 0.08 | 0.50 | 0.25 | 0.17 | 0.08 | 0.00 | 0.08 | 1.17 |
HRSL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSR | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.33 | 0.33 |
HALL_OFF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Comments: 00:25 Target alarm due to temperature fluctuation; trying to slowly bring beam back 01:25 Target is responding well to slow ramping up of beam -- currently at 100 uA 01:45 Target has PID issues at 100 uA. Target alarm goes off. We've decided to run at 90 uA beam for production (see HALOG 298690,298691) 02:30 Multiple beam trips causing target alarm for past 20 mins. 04:00 Production at I ~ 90 uA running smoothly 06:46 Smooth data taking all night, up until LHRS coda crash -- no response from TS. (See HALOG 298727.) 08:00 RHRS Q2 Liquid He level is low; calling tech-on-call to help fix the problem.
Data Entry by: David Flay