• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name D.Wang/Kai/R.Subedi

    Log entry time 18:57:05 on November 10, 2009

    Entry number 298815

    keyword=Right arm pion veto(late entry)

    We checked the pion veto signal for the right arm DAQ and found that the gas cerenkov and T1 signals are of the same width before forming the veto, which is wrong according to the design. So we changed the gas cerenkov width to 50 and the T1 to 20. We should get a correct pion veto from now on.