• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Jin Huang

    Log entry time 23:58:37 on November 10, 2009

    Entry number 298866

    keyword=Shift Summary Nov 10 Swing

    Shift start with control access. RHRS magnets are ready; LHRS dipole is still down. Both VDC off. LD2 target.

    16:13 RHRS Q3 is cycled. Didn't see Q2 history. So cycling it to 1400A and back.

    16:31 LHRS Dipole recovered (miraclely)

    16:41 Beam permit; Beam recover with Compton

    17:13 Harp Scan:

    17:15 Establishing New Beam Recovery Procedure (for BPM A = B = (0 , 0)mm) by Yi Qiang

    18:00 Asked for 100uA beam for production

    18:09 Experts finish the checking. Starting production run 13868/4917/25366

    18:21 Beam off for some hall B tuning. Stop run.

    20:47 Control Access for quick fixing on PVDIS DAQ narrow trigger

    21:07 Control Access ended

    21:33 Beam back. Starting tuning precedure @ new beam location = BPM A = B = (-0.7,0.0)mm.

    22:16 Start Production Run : 11870/25373/4925

    22:13 Start Production Run : 11871/25374/4926


    Production run list

    1. 13868/4917/25366 <- Stopped early due to beam problem
    2. 11870/25373/4925 <- Beam Trip a lot in the middle
    3. 11871/25374/4926