• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name R. Michaels

    Log entry time 14:02:03 on November11,2009

    Entry number 298995

    keyword=Coulomb meter started

    We're on slug 1.  We had 3 productive owl shifts, two
    with R-HRS only, and 1 (last night) with both HRS.
    
    First production run was 13843
    Runs 13843 to 13867 are R-HRS only.  Q = 1.54 C
    Runs 13870 to 13882 are both arms.  Q = 1.48 C
    
    Therefore we have approximately
    R-HRS Q = 3.0 C
    L-HRS Q = 1.5 C
    
    We need to consider L and R-HRS separately (different kinematics).
    
    Also the scripts that do the Coulomb meter update are partly
    broken.  The directory ~/pvdis/RC was made at noon today.