• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Kai

    Log entry time 22:23:21 on November11,2009

    Entry number 299036

    keyword=spot++, 6*6 MCC in LD2, ready for production

    4*4mm in our side with no wall hitting. check the T1 rate which is still consistent with the one posted on the right wall. Ask for MCC for 100uA beam.


    FIGURE 1

    FIGURE 2