Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Kai
Log entry time 22:23:21 on November11,2009
Entry number 299036
keyword=spot++, 6*6 MCC in LD2, ready for production
4*4mm in our side with no wall hitting. check the T1 rate which is still consistent with the one posted on the right wall. Ask for MCC for 100uA beam.
FIGURE 1
FIGURE 2