User name E. Cisbani
Log entry time 16:03:37 on November12,2009
Entry number 299255
keyword=Day Shift Summary
11/12/09 Day Shift Summary
08:00 Moller measurements delayed do to vacuum problem in the beam
09:15 Moller tuning started
11:30 Moller measurements complited
11:35 Moving to Optics target for gas Cherenkov tuning, raster off, 10 uA
12:07 VDC HV turned off / 20 uA
12:15 Requested Control access to work on Compton Pump
14:56 IHWP moved IN
15:00 Start beam startup procedure; empty target
15:35 Checked beam energy, position and raster on BeO; VDC ON, move to LD2
15:44 Target is LD2, asked 2 uA (got 3)
15:55 Low current run with VDC ON
15:57 Switch Off VDC
Run Summary PVDIS/L/R
./25406/4958 Cherenkov tuning
./24407/4959 Cherenkov tuning
./24408/4960 Cherenkov tuning
./24409/4961 Cherenkov tuning
./24410/4962 Cherenkov tuning
./25411/4963 Cherenkov tuning
13896/./. Diethering study
./25416/4965 VDC with HV on LD2 target, I=3 uA (asked 2), raster 6x6 MCC