    11/12/09 Day Shift Summary
    
    08:00 Moller measurements delayed do to vacuum problem in the beam
    
    09:15 Moller tuning started
    
    11:30 Moller measurements complited 
    
    11:35 Moving to Optics target for gas Cherenkov tuning, raster off, 10 uA
    
    12:07 VDC HV turned off / 20 uA
    
    12:15 Requested Control access to work on Compton Pump 
    
    14:56 IHWP moved IN
    
    15:00 Start beam startup procedure; empty target
    
    15:35 Checked beam energy, position and raster on BeO; VDC ON, move to LD2
    
    15:44 Target is LD2, asked 2 uA (got 3)
    
    15:55 Low current run with VDC ON
    
    15:57 Switch Off VDC
    
    
    Run Summary PVDIS/L/R
    
    ./25406/4958 Cherenkov tuning 
    ./24407/4959 Cherenkov tuning
    ./24408/4960 Cherenkov tuning
    ./24409/4961 Cherenkov tuning
    ./24410/4962 Cherenkov tuning
    ./25411/4963 Cherenkov tuning
    13896/./.    Diethering study
    ./25416/4965 VDC with HV on LD2 target, I=3 uA (asked 2), raster 6x6 MCC