Log entry time 00:03:56 on November13,2009
Entry number 299382
keyword=Swing Shift Summary
11/12/09 Swing Shift Summary
Shift workers: J. P. Chen (SL), B. Zhao (TO), S. Phillips (3rd).
Weather has been pretty bad: Nor'easter causes heavy rain with strong wind. It
will be like this until sometime on Friday.
16:00 Recovering from down. Beam position, raster etc. already checked. In the
proceee of ramping down VDCs.
16:05 VDCS are down requested MCC for 100 uA.
MCC has problem raising current beyond 10 uA. Working on path length problem.
16:38 beam current coming up to 100 uA.
16:40-16:57 Rupesh did PITA run and turned on HAPPEX feedback.
Rupesh also turned on dithering.
16:57 production
Compton experts (Camsonne and Friend) are working on optimizing conditions for
the Compton detectors.
18:10 beam off, MCC said maybe 10 minutes.
18:30 Diancheng Wang ran flipper (which should be run every time
after 1/2 wave plate change).
18:35 MCC had more problems: there was a power surge, acused multi crates off.
19:20 Called MCC, MCC said it would be at least another hour.
20:50 MCC called, ready to send tune beam.
21:25 Beam tune done. Asking for 2 uA for a harp scan.
21:34 Asking for raster 4x4 (MCC), doing spot++ with left HRS,
rates are fine (R:1.8kHZ, L:8kHz). ramping VDC up.
21:44 asking for raster 6x6 (MCC), doing spot++ with left HRS.
Rates are R:1.7KHz, L: 7 KHz.
VDC HVs up at 4 KV.
21:50 Qsq measurements for both HRS'.
21:53 tuning VDC HVs to 0.
21:56 asking for ramping up to 100 uA.
22:02 resume production.
24:00 smooth production.
run information:
Happex runs
13900 16:57-17:54, 100K (ran flipper after this run)
13901 18:14-19:11, 100K (no beam)
13902 22:03-22:59, 100K
13903 23:00-23:57, 100K
13904 23:57- still ongoing at the end of shift.
Left HRS runs
25419, 17:01-17:55, 4.45M
25420, 18:15-20:48, no beam
25421-25422, spot++ check with 4x4 (MCC)
25423, spot++ with 6x6 (MCC)
25424, 21:50-21:53, 381K, QSQ measurement
25425, 22:03-22:59, 4.73M
22426, 23:01-23:58, 4.9M
22427, 23:58- still ongoing at the end of shift.
Right HRS runs
4978, 17:01-17:54, 5M
4979, 18:15-20:48, no beam
4980, 21:51-21:53, 173K, QSQ measurement
4981, 22:03-22:57, 5.01M
4982, 23:00-23:53, 5M
4983, 23:53- still ongoing at the end of shift.