• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name jpchen

    Log entry time 00:03:56 on November13,2009

    Entry number 299382

    keyword=Swing Shift Summary

    11/12/09 Swing Shift Summary
    
    Shift workers: J. P. Chen (SL), B. Zhao (TO), S. Phillips (3rd).
    
    Weather has been pretty bad: Nor'easter causes heavy rain with strong wind. It 
    will be like this until sometime on Friday.
    
    16:00 Recovering from down. Beam position, raster etc. already checked. In the 
    proceee of ramping down VDCs.
    16:05 VDCS are down requested MCC for 100 uA.
    MCC has problem raising current beyond 10 uA. Working on path length problem.
    16:38 beam current coming up to 100 uA.
    16:40-16:57 Rupesh did PITA run and turned on HAPPEX feedback.
    Rupesh also turned on dithering.
    16:57 production
    Compton experts (Camsonne and Friend) are working on optimizing conditions for 
    the Compton detectors.
    18:10 beam off, MCC said maybe 10 minutes.
    18:30 Diancheng Wang ran flipper (which should be run every time 
    after 1/2 wave plate change).
    18:35 MCC had more problems: there was a power surge, acused multi crates off. 
    19:20 Called MCC, MCC said it would be at least another hour.
    20:50 MCC called, ready to send tune beam.
    21:25 Beam tune done. Asking for 2 uA for a harp scan.
    21:34 Asking for raster 4x4 (MCC), doing spot++ with left HRS,
    rates are fine (R:1.8kHZ, L:8kHz). ramping VDC up.
    21:44 asking for raster 6x6 (MCC), doing spot++ with left HRS.
    Rates are R:1.7KHz, L: 7 KHz.
    VDC HVs up at 4 KV.
    21:50 Qsq measurements for both HRS'.
    21:53 tuning VDC HVs to 0.
    21:56 asking for ramping up to 100 uA.
    22:02 resume production.
    24:00 smooth production.
    
    run information:
    Happex runs 
    13900 16:57-17:54, 100K (ran flipper after this run)
    13901 18:14-19:11, 100K (no beam)
    13902 22:03-22:59, 100K 
    13903 23:00-23:57, 100K
    13904 23:57- still ongoing at the end of shift.
    
    Left HRS runs
    25419, 17:01-17:55, 4.45M
    25420, 18:15-20:48, no beam
    25421-25422, spot++ check with 4x4 (MCC)
    25423, spot++ with 6x6 (MCC)
    25424, 21:50-21:53, 381K, QSQ measurement
    25425, 22:03-22:59, 4.73M
    22426, 23:01-23:58, 4.9M
    22427, 23:58- still ongoing at the end of shift.
     
    Right HRS runs
    4978, 17:01-17:54, 5M
    4979, 18:15-20:48, no beam
    4980, 21:51-21:53, 173K, QSQ measurement
    4981, 22:03-22:57, 5.01M
    4982, 23:00-23:53, 5M
    4983, 23:53- still ongoing at the end of shift.