Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Fatiha
Log entry time 08:06:02 on November15,2009
Entry number 300010
keyword=Shift Summary
Shift Crew: F. Benmokhtar, E. Cisbani, D. Wang
-----------
PS: Third person didn't show up. Thanks to D. Wang for
staying over the shift and doing analysis.
00:00... BCM asymmeries were too big, Paul andf Rupesh loaded
correct files to the Feedback, things are back to normal.
00:50... Beam went down from 85uA to 80uA, MCC says they are trying
to keep it stable and avoid so many trips.
*We are running at 80uA since beam quality is not good
at higher currents.
07:12... Beam down, MCC needs 15 minutes or so to bring it back
07:27... Beam back
Run list summary @ 80uA
-----------------------
HRS_L:
------
25490 ... 3.7 M
25491 ... 4.3 M
25492 ... 4.4 M
25493 ... 4.7 M
25494 ... 4.6 M
25495 ... 4.5 M
25496 ... 4.5 M
25497 ... 4.3 M
HRS_R:
------
5041 ... 4.04 M
5042 ... 4.65 M
5043 ... 4.90 M
5044 ... 5.10 M
5045 ... 4.50 M
5046 ... 4.90 M
5047 ... 4.85 M
5048 ... 4.73 M
HAPPEX:
-------
13964 ... 100 K
13965 ... 100 K
13966 ... 100 K
13967 ... 100 K
13968 ... 100 K
13969 ... 100 K
13970 ... 100 K