• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Fatiha

    Log entry time 08:06:02 on November15,2009

    Entry number 300010

    keyword=Shift Summary

    Shift Crew: F. Benmokhtar, E. Cisbani, D. Wang
    -----------
    PS: Third person didn't show up. Thanks to D. Wang for
    staying over the shift and doing analysis.


    00:00... BCM asymmeries were too big, Paul andf Rupesh loaded
    correct files to the Feedback, things are back to normal.

    00:50... Beam went down from 85uA to 80uA, MCC says they are trying
    to keep it stable and avoid so many trips.
    *We are running at 80uA since beam quality is not good
    at higher currents.

    07:12... Beam down, MCC needs 15 minutes or so to bring it back
    07:27... Beam back




    Run list summary @ 80uA
    -----------------------

    HRS_L:
    ------
    25490 ... 3.7 M
    25491 ... 4.3 M
    25492 ... 4.4 M
    25493 ... 4.7 M
    25494 ... 4.6 M
    25495 ... 4.5 M
    25496 ... 4.5 M
    25497 ... 4.3 M

    HRS_R:
    ------
    5041 ... 4.04 M
    5042 ... 4.65 M
    5043 ... 4.90 M
    5044 ... 5.10 M
    5045 ... 4.50 M
    5046 ... 4.90 M
    5047 ... 4.85 M
    5048 ... 4.73 M

    HAPPEX:
    -------
    13964 ... 100 K
    13965 ... 100 K
    13966 ... 100 K
    13967 ... 100 K
    13968 ... 100 K
    13969 ... 100 K
    13970 ... 100 K