• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name folts

    Log entry time 17:06:11 on November 16, 2009

    Entry number 300371

    keyword=compton/tech

    During the opening the vacuum group and company regenerated one of the ion pumps on the DP station and separated the controls in order to give better diagnostics and help the vacuum.

    The Compton from the laser enclosure to the DP station was re leak checked and no leaks found.

    During the operational check out after the leak check a bad Ion Pack (controller) was found and replaced. This should help the vacuum which was -8 range or better when we left the Hall.