    User name bogdanw

    Log entry time 15:59:53 on November20,2009

    Entry number 301391

    keyword=shift summary

    production run slug 6 IHWP: IN

    beam up to 105 muA

    9:50 beam back after "120" muA study
    10AM start set of runs: "current scan"
    run 14085 with 20 muA
    run 14086 with 100 muA
    controll access from 11:15
    beam back at 12AM
    Dead time test:
    run 14087 with 95muA
    run 14088 with 80muA
    run 14089 with 60muA
    run 14090 with 40muA ended due to PVDIS CODA crush
    13:15 - restart PVDIS CODA
    run 14091 with 40muA
    run 14092 with 20muA
    run 14093 with 40muA
    14:10 back to production.
    run 14094-PVDIS 25637-LHRS 5192-RHRS 100muA
    25678-LHRS 5193-RHRS
    03:00 beam up to 115muA
    run 14095 production
    lumi HV was adjusted after that