• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Kai

    Log entry time 01:27:08 on November24,2009

    Entry number 302251

    keyword=the spectrum change a lot in the e+ run and unable to check the timing

    I'm going to check the left arm electron path timing since we just add a delay 
    on the group 5 path. However, the spectrum in the e+ run changes a lot compared 
    with the e- run due to the low e+ rate I think , thus I am not able to use 
    these runs to check the timing until we go to the production. The run I used 
    are #25728 and #5275, both have 200K events analyzed.
    


    FIGURE 1

    FIGURE 2