• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Kai

    Log entry time 04:55:40 on November24,2009

    Entry number 302290

    keyword=stop high current run and start to ramp down right dipole

    It took MCC 20 minutes to give us 110uA beam from 3:40 to 4:00. So we start the 110uA high current run at 4:00 and stopped the run at 4:40. There is only one run here #5280 and #25733. So now our high current run time reaches 2.5 hours also.

    The right arm dipole is ramping down now. I also turn on the VDC to take 2uA beam on both arms, however, only left arm run is usable.


    FIGURE 1