Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name R. Michaels
Log entry time 13:16:25 on November 24, 2009
Entry number 302338
Followups:
keyword=near-term Compton plan
After discussing with P. Souder and Alex here is a near-term Compton plan
Last night Alex put in the Edet. I'm not sure what the result was (still
a bit noisy but not as bad as before). I guess he'll post spectra later.
The noise in the accum0 of FADC is 4 times higher than we need. But this
means we are close. Meanwhile we see asymmetries with accum2 which uses
a threshold cut which is undesirable. There's a decent chance we'll be
in good shape if :
1. Reduce background in Edet (also reduces in photon det ?)
2. Install the smaller-hole collimator (planned for next week)
Regarding the Edet, one piece of info we need soon is how much the
background reduces if we close the slits. If this causes a dramatic
reduction then more injector tuning is needed, using the Edet as the
monitor to feedback on. We don't plan on any major tuning before
Monday, but a brief run with closed slits after Alex is ready is
desirable.
Getting the Edet to work at 6 GeV is very desirable. Having the
zero-crossing will help pin down the B*dl and provide a check on
the lower-energy results, both HAPPEX-3 and PREX.
A copy of this log entry has been emailed to: souder@physics.syr.edu,camsonne,paschke