• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Kai

    Log entry time 06:17:59 on November 25, 2009

    Entry number 302435

    Followups:

    keyword=Access report (Right arm work)

    In the access, I went to the Right arm, and Diancheng worked on the left arm. The right arm work are:

    1. Measure the width of T1 input signal in 755, and it is 100ns.

    2. Change the width of GC back from 40ns to 50ns as before. The diagram attached below explained why there is no problem on the right arm VETO, even if we decreased the width by 10ns width yesterday.

    3. Xscaler checked and signal is there. I will make followup entry about the new spectrum plot when beam back.




    Figure 1