Run Coordinator's Report for Friday November 27 Day to Saturday
November 28 Owl
Summary
- 4 Owl shifts in the next week need a shift leader.
Please sign up!
- We took 20 hours of ABU over the last 24 hours in which we completed
slug 9 and achieved ~150 K good LD2 pairs for slug 10.
- There were beam quality concerns and a high trip rate during Swing
shift. MCC raised the Compton ion chamber trip rate. The Compton rates
have deteriorated significantly since Wednesday, the high voltage has
been lowered to 1400 V. We will ask MCC to tweak the injector.
Run Plan
- High current production running throughtout weekend.
- Today there will be some dead time studies for about 2 hours at
variable currents.
- Tomorrow there will be Compton studies for about 3 hours at low
current, possibly combined with opportunistic Q2 measurement and
Moller.
Requests
- 4 Owl shifts in the next week need a shift leader. Please
sign up!
- Shift Leaders: please write a detailed shift summary (including
runs taken and any
activities) and submit the BTA for each shift. Please log CODA reboots
in the halog and shift summary.
- 3rd person: Please make sure to start and stop the HRS DAQ
at the same time as the parity DAQ and to do the prompt analysis and the
HRS analyzer for every run.
- 3rd person: please keep a careful eye on the online data display.
Most problems can be caught quickly this way.
- Please make sure that the shift checklist is done once each shift.
Data taken
- Production charge taken in the 24 hours ending Saturday Owl: 3.8
C
- Total production charge taken in all, end of Saturday Owl: 40.0
C