User name B. Quinn
Log entry time 16:01:10 on November29,2009
Entry number 303543
keyword=Day shift summary
08:00 Start of shift. Q1 is down on R-HRS. Previous shift has been unable to reset and has notified RC. We continue taking data on L-HRS.
~9:00 called RC and Tech on call about R-Q1 problem. May need to cycle power supply in hall.
09:40 RC here. Called MCC to request escorted controlled access for Ed Folts to tryo to reset power supply.
09:53 Ed makes access. No luck restoring R-Q1. Cryo problem. (Lead outlet pressure too high??)
10:17 Request that MCC restore beam
10:29 Beam back
11:45 RC advises R-Q1 will be down until tomorrow morning.
13:20 Ask MCC to close slits for Compton test. Moving target out of beam.
~13:30 Asked MCC to tune for Moller (with slits closed for Compton tests)
~13:30 R-Dipole crashed. Indicating Lead A voltage fault. R-Q3 crashed a few minutes later.
Will leave both magnets off since R-Q1 is already off preventing us from running.
14:40 LHe level in R-dipole is beginning to recover from quench
14:50 LHe level in all magnets is good (~80%).
16:00 At end of shift, Compton studies are continuing with low current beam with small slit settings on chopper. Efforts at parallel Moller studies have been abandoned.
Parity
08:55 14316
09:53 14317
11:26 14318
12:24 14319
13:20 14320
L-HRS
09:02 25859
11:24 25860 (Automatic entry is wrong!! it says run 25861 ended!)
13:02 25861
13:20 25862
R-HRS (down because of Q1 problem)