Meanwhile, Alex C. and Megan F. have gone to the Hall to work on the Compton - installing collimation for the photon detector, I believe.
Finally, Ramseh S. has just gone down to work on the right arm DAQ, which has stopped responding.
In each case, we have checked with the RC (Brad S.) to keep him "in the
loop", as he wanted to ensure access did not extend excessively.