    User name miham

    Log entry time 17:21:56 on December 4,2009

    Entry number 304662

    keyword=Beam problems and Controlled Access

    We called MCC and they need to make an access to Linac to
    fix the valve. At the moment they are waiting for the
    Vacuum crue. They are hoping to fix the problem within an hour.

    There is also a problem with a left arm (the rate in this
    spectrometer is to low). Therefore we requested for a escorted
    controlled access to fix the problem. At this time MCC
    (because of their own problems) can not send ARM to sweep
    the hall A. They told us to wait until they are done
    sweeping the Linac tunnel.



    FIGURE 1