    Swing shift summary: Miha Mihovilovic (SL), J.P. Chen (TO),
                         Jin Huang (3rd)
    ===================================================================
    
    EVENTS
    ------
    
    16:00  At the beginning of the shift MCC was doing HARP scan.
            
    16:03  MCC finished with harp scan. Results are: 
           HARP-A sigma(x/y): 243/142
           HARP-B sigma(x/y): 245/107
            
    16:08  MOved to BeO
    
    16:10  Requested for 2uA beam with no Raster
    
    16:14  We checked the position of the beam spot on the camera. 
           Beam seems to be in correct position.
           
    16:15  Moved target to LD2 target. Asked MCC to turn the raster
           on to 6x6MCC
           
    16:24  Target is in place, asked for 2uA beam with raster 6x6MCC
           Target is LD2
           
    16:30  Did the Spot++ with 2uA. Spot looks fine. Spot++ run is
           #26125
           
    16:31  Asked for 105uA beam with raster 6x6MCC. Want to start with
           the production.
           
    16:40  Did Spot++ check for the first production run #26126. Spot
           looks ok. Beam positions are also OK.
           
    18:30  Asked MCC to mask target motion, so that we can move target 
           multifoil 12C target. We are going to do optics runs.
           We also turned the raster OFF.
           
           
    18:35  We are at multifoil 12C target. We are going to take T1
           runs only. 
           
    18:38  Turning the VDC chambers ON.
    
    18:43  VDC chambers are ON! Taking runs #26128/#5640 on
           multifoil 12C target with 10uA beam, no raster. 
           
    18:52  Asked MCC to turn the raster back on to 6x6mMCC
    
    18:54  Taking runs #26129/#5641 on multifoil 12C target with 10uA 
           beam, (6x6)MCC raster. Did the spot++ check. Spot size
           looks fine :)
           
    19:04  Asked MCC to mask the tar. motion so that we can go to 
           Single carbon target. Also asked MCC to turn the raster OFF.
           
    19:06  Taregt is in single carbon foil position. 
           
    19:17  The T1 rate was low with 10uA beam (T1 rate was 330Hz). 
           Therefore we increased the current to 25uA. Now T1
           rate is 900Hz
           
    19:23  Asked MCC to turn the raster ON to (6x6MCC)
    
    19:30  Taking runs #26131/#5643 on Single foil 12C target with 
           25uA beam, (6x6)MCC raster. Did the spot++ check. Spot size
           looks fine :)
           
    19:33  Asked MCC to mask the target motion so that we can move our
           target to Al Dummy. 
           
    19:36  Target is in Dummy position. Asked for 10uA beam. Rates for
           T1 look fine. T1 is approx 1kHz.
           
    19:37  Taking runs #26132/#5644 on Al-Dummy target with 10uA beam, 
           (6x6)MCC raster. Did the spot++ check. Spot size looks fine. 
           
    19:49  Turning off the VDCs.
    
    19:57  VDCs are OFF. We asked for 50uA beam to do High current 
           optics measurement on Aluminum. 
           
    20:02  Taking runs #26134/#5646 on Al-Dummy target with 50uA beam, 
           (6x6)MCC raster. Did the spot++ check. Spot size looks fine. 
           VDCs are OFF.
           
     22:00 MCC called and reported that they have problems with two 
           Cryo modules and then need 10 or 15 minutes to bring them back
           up. We decided to stop our current runs. 
           
    
    22:40  We received call from MCC reporting that there were also some 
           other modules that have problems and they need to be recovered. 
           Consequently they will be down for a while. They explained to 
           us that they are calling experts in and when they arrive, they 
           will let us know, how long is "a while". 
           
           
    23:58  Moving the target to Empty. Turning the raster off.
        
    
    
    
    
    
      
                                   RUN LIST
    ===================================================================
    
    Compton DAQ:
    --------------
    
    
    Right Arm DAQ:
    --------------
    
    LD2 production runs:
    5638, 5639
    
    MultiFoil Carbon Runs:
    5640, 5641
    
    Single Carbon Runs:
    5642, 5643 
    
    Al Dummy runs:
    5644, 5646, 5647, 5648 (short)
    
    
    Left Arm DAQ:
    --------------
    
    LD2 runs during the beam recovery procedure:
    26124, 26125
    
    LD2 production runs:
    26126, 26127
    
    MultiFoil Carbon Runs:
    26128, 26129
    
    Single Carbon Runs:
    26130, 26131 
    
    Al Dummy runs:
    26132, 26134, 26135, 26136(short)
    
    
    
    Happex DAQ:
    -----------
    
    LD2 production runs:
    14554, 14555
    
    
    Al Dummy runs:
    14556, 14557, 14558
    
    					       		      			        
    


    A copy of this log entry has been emailed to: miham