Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name dalton
Log entry time 00:18:30 on March26,2010
Entry number 313720
Followups:
keyword=Swing Shift Summary
Shift Summary
-------------
MCC handed us 50 uA beam just before 10pm. Good job guys! We asked for a raster of 8x8 MCC units and did spot++. The resulting spot was very small at ~1mm. We asked MCC to increase the raster to the max which is 36.6x36.6 MCC. Mike did some harp scans of the beam at various raster settings, which are summarised in his elog. The fits are bad but I think the data is still interesting.
http://opweb.acc.jlab.org/CSUEApps/elog02/elog_item.php?elog_id=1514073
We then ran spot++ on the max raster and found a beam size at the target of about 2 x 2.5 mm.
Runs
----
26918 and 6317 Empty target
26919 Empty target
midnight: MCC-driven test in progress.