    User name dalton

    Log entry time 00:18:30 on March26,2010

    Entry number 313720

    Followups:

    keyword=Swing Shift Summary

    Shift Summary
    -------------

    MCC handed us 50 uA beam just before 10pm. Good job guys! We asked for a raster of 8x8 MCC units and did spot++. The resulting spot was very small at ~1mm. We asked MCC to increase the raster to the max which is 36.6x36.6 MCC. Mike did some harp scans of the beam at various raster settings, which are summarised in his elog. The fits are bad but I think the data is still interesting.

    http://opweb.acc.jlab.org/CSUEApps/elog02/elog_item.php?elog_id=1514073

    We then ran spot++ on the max raster and found a beam size at the target of about 2 x 2.5 mm.



    Runs
    ----

    26918 and 6317 Empty target
    26919 Empty target

    midnight: MCC-driven test in progress.