    16:00 Shift start
    Hall A in restricted access. Moller magnet cooling down.
    17:10 Hall still in restricted access estimate for closing 18:00.
    18:00 Hall under sweep
    18:30 Hall closed
    18:35 Javier noticed a problem with Q1 on the left spectrometer
    Asked for controlled access with Javier who tried to reset the panic button interlock. Not successful
    19:00 called Jack to explain the issue and ask for help.
    Went back down a second time to try to reset the panic button interlock but found that the door was open and thus the interlock was active.
    19:25 called MCC to resume beam back into the Hall. Q1 is fine now.
    19:30 MCC called to say that that will be sending beam and doing their test of the Moller quads.
    20:33 MCC called to inform us that they will be sending some CW beam.
    21:00 Requested BPMA (-0.4, +0.9) and BPMB(0.0 2.9) positions to MCC for beam startup/recovery
    21:20 Seamus is in for the HRS tune study
    21:30 Moved target to Tantallum, raster off and BPMA and B at (0,0)
    22:10 Requested BPMA (0,0 4.0) and BPMB (0.0,4.0) at first.
    See Seamus detailed log for the optics study.
    24:00 Shift Ended