    User name O.Glamazdin

    Log entry time 01:57:25 on March 31, 2010

    Entry number 314779

    keyword=Moller commissioning results

    SC Moller magnet alignment was measured. Very preliminary: displacement in horizontal plane (X) -0.2mm displacement in vertical plane (Y) -1.6mm rotation around X -2mrad rotation around Y -4mrad From Jay for the fast raster on the Moller target 1*1mm we need 2.25*4.5 raster in MCC units After alignment test Moller settings were loaded. We used the target 1 (1micron) and CW beam 1.5 mA to take a few runs to tune new Moller detector HV. Moller magnet was working properly. Moller target motion was under control. Moller magnet LHe tank has to be refilled as soon as it is possible in the morning. We need more time to analyze the magnet displacement.