    User name adaq

    Log entry time 00:43:50 on April 2,2010

    Entry number 315620

    keyword=Partial swing shift summary

    16:00 Shift start
    Beam study still going on.
    16:20 Pulse mode beam
    17:00 J. Benesh called to say that good progress has been made on the beam and the projection is a wrap up at 18:00
    New update from Benesh wrap up at 18:30 instead of 18:00
    17:10 sending CW beam for HARP scans
    18:20 Good with all the tests need a spot++ check
    18:35 Beam in position BPMA (-0.4, +0.9) BPMB (0.0, 2.1)
    MCC asked us to look at spot size
    Current 5 uA, empty target raster on set at 9x9
    we find x width about 2mm and y width about 4mm.
    MCC goes into tune mode to try to double the width in x and ceter it in y
    18:45 Beam tune
    18:50 ready for another spot++ check.
    The results are posted and correspond to +4mm in both in x and y
    19:00 MCC ramped the current up to 100uA without BLM trips
    19:10 MCC is ready to deliver beam.
    Problem: Unable to connect to ROC7.
    19:40 Request 50uA from MCC and run the parity DAQ.
    20:00 Bob Michaels setting up Tune B
    20:25 Rupesh is taking the parity DAQ back.
    20:30 Seamus called and gave the current of the septa for the new tune to be 729A after his optics analysis.
    20:40 Tune B set. Called Dustin. Requested a call to MCC for escorted access for the right and left spectrometers huts at 21:00.
    21:05 called MCC to requested access
    21:10 Dustin and the ARM going to the Hall.
    21:50 Dustin back from the Hall