Log entry time 00:43:50 on April 2,2010
Entry number 315620
keyword=Partial swing shift summary
16:00 Shift start
Beam study still going on.
16:20 Pulse mode beam
17:00 J. Benesh called to say that good progress has been made on the beam and the projection is a wrap up at 18:00
New update from Benesh wrap up at 18:30 instead of 18:00
17:10 sending CW beam for HARP scans
18:20 Good with all the tests need a spot++ check
18:35 Beam in position BPMA (-0.4, +0.9) BPMB (0.0, 2.1)
MCC asked us to look at spot size
Current 5 uA, empty target raster on set at 9x9
we find x width about 2mm and y width about 4mm.
MCC goes into tune mode to try to double the width in x and ceter it in y
18:45 Beam tune
18:50 ready for another spot++ check.
The results are posted and correspond to +4mm in both in x and y
19:00 MCC ramped the current up to 100uA without BLM trips
19:10 MCC is ready to deliver beam.
Problem: Unable to connect to ROC7.
19:40 Request 50uA from MCC and run the parity DAQ.
20:00 Bob Michaels setting up Tune B
20:25 Rupesh is taking the parity DAQ back.
20:30 Seamus called and gave the current of the septa for the new tune to be 729A after his optics analysis.
20:40 Tune B set. Called Dustin. Requested a call to MCC for escorted access for the right and left spectrometers huts at 21:00.
21:05 called MCC to requested access
21:10 Dustin and the ARM going to the Hall.
21:50 Dustin back from the Hall