We're coming out of controlled access, having done the following: Switched the quartz detectors to integrating mode. Moved both sets of A-T detectors ~11000 steps away from the beamline (+11000 steps). Both A-T hole detectors are now at the far range of their motion in y. Installed a GEM in the left arm.