User name M. Jen
Log entry time 15:50:21 on April 3,2010
Entry number 315971
keyword=04/03/10 Day Shift Summary
07:30 AM have beam back
08:00 AM Run Plan for Lead integrating mode is still going on...
We just get the fast feedback going for a minimal current =
2.5 uA
08:20 AM Luis is coming in, and he works on A_T scanning...
move A_T detector around, to see where the optimal position
is
09:00 AM Q1 L-arm magnet quench
09:15 AM Mark and Sasha get access to the hall; Mark checks spectrometer magnets, and Sasha refills Moller magnet
09:30 AM Mark requests for a tech on-call (Howard Smith)
09:40 AM I page the tech 0n-call
09:45 AM Mark finds two L-arm magnets quench; two R-arm magnets quench
10:08 AM move the target to the empty position
10:32 AM wait for MCC to turn Moller Dipole/Quadropole on
10:55 AM Tech (Howard Smith) is coming to fix the quadropoles...
11:05 AM Escourted Access; page tech (Howard Smith)
11:30 AM Mark and tech (Howard Smith) come out of the hall
11:40 AM MCC plans to send the beam back
11:55 AM Sasha asks MCC to move Moller target (#1)
12:15 PM Moller Commissioning starts...
12:24 PM Moller is still being tuning; no Moller electron peaking in
the energy spectrum, but the output result looks much better
after switching the cable (supposed to be)
12:45 PM get good Moller asymmetry result from old DAQ; Moller run
good number is from 14238
01:00 PM adjust HV to change PMT signal pulsar's height in Moller
FADC
01:26 PM Sasha calls MCC to change the beam position in order to get
a more stable beam currrent