Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name R. Michaels
Log entry time 00:10:26 on April24,2010
Entry number 319076
keyword=putting in thick C12
23:45 .... Putting in thick C12 target.
Will run like this until about afternoon sometime.
Plan is to take two slugs tonight at 50 uA, then
try to increase the current during the day.
Watch the temperatures ! If they go too high, reduce the
beam current.
The HV's listed in the opmanual HV for C12 which were
lower than for Pb208. This is wrong. We will adjust
HV to put the detectors at ~0.65 of the max ADC.
23:51 .... Ask for 17x7 raster (we were running with bigger
raster since about 7 pm).
Bumping up HV
The mapping of "upper Quartz" (name) to HV channel is from the
opmanual. The mapping of the HV channel to "det1" (name) is
from observational reality as we change them.
Right HRS
upper Quartz .... chan 4 ... is det2 .... increase from 810 to 950V
get 150K
lower Quartz .... chan 6 .... is det1 .... 880 -> 1000. get 150K
------------------------
Left HRS
lower Quartz .... chan 2 .... is det4 .... 750 -> 865. get 158K
upper Quartz .... chan 4 .... is det3 .... 850 -> 975. get 146K
Run 3084 was the run taken while we adjusted HV. Call it junk.
Run 3085 is the first production run with thick C12.