• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name R. Michaels

    Log entry time 00:13:01 on April26,2010

    Entry number 319517

    Followups:

    keyword=Switch to thick C12

    Will run with thick C12 tonight with rampdelay (effective) = 400 usec.
    The actual parameters are
    setTimeHAPTB(112, 1420);

    Hence 112*2.5 usec + 120 usec = 400 usec
    where 120 usec comes from 100 usec Tsettle plus
    observed 20 usec additional delay.

    The timing was checked on a scope in CH. Ramp delay 412 usec
    and the Tend was about 200 usec. Fine.

    Adjusted HV for thick C12. Need to check with panguin.
    I'm a little worried about the swing shift data because
    the detector HV seemed low to me, and the shift reported
    that all prompt analyses are crashing now --> no plots.

    R-HRS card 14
    chan 4 = 950
    chan 6 = 1000

    L-HRS card 2
    chan 2 = 865
    chan 4 = 975

    Also adjusted the Blumi in accord with the opmanual.
    (The main detector HV for thick C12 are wrong in the opmanual.)

    Run 3141 is junk. We are adjusting HV and checking signals
    during this.