    User name bogdanw

    Log entry time 00:04:46 on May 2,2010

    Entry number 320429

    keyword=shift summary

    Shift was started at 6pm.
    Jack is working with HRS-L dipole.
    Compton team is doing some work with the cavity.
    They will close it by 8pm but vaccum will be poor.

    8:20pm sweep is started.
    9:00pm sweep is completed.
    Compton guys need short access to cleanup area.
    11pm start beam recovery
    obtained 5 muA on empty target
    Raster check with T8 pulser: 4 x 3 mm OK
    BeO check is OK
    attenuator 65 slit 13 made T5 rate of 1.5 kHz

    move to the empty target for cavity calibration