Shift was started at 6pm.
Jack is working with HRS-L dipole.
Compton team is doing some work with the cavity.
They will close it by 8pm but vaccum will be poor.
8:20pm sweep is started.
9:00pm sweep is completed.
Compton guys need short access to cleanup area.
11pm start beam recovery
obtained 5 muA on empty target
Raster check with T8 pulser: 4 x 3 mm OK
BeO check is OK
attenuator 65 slit 13 made T5 rate of 1.5 kHz
move to the empty target for cavity calibration