    00:00 Status at start of shift:

    Bob Michaels, Krishna Kumar and Jon Wexler are in the counting house working on the raster synch tests, test 5 of 9 (see log entry #321128). Raster size is 6x4mm2.

    00:06 Called MCC to ask that they ramp current up to 50 uA (over about 1 minute).

    00:08 Called MCC to ask that they ramp down and back up (over about 1 minute).

    00:20 Called MCC to request better beam positions - they were ~1, 1 and 2, 2 in BPM A and B (x and y).

    00:32 Beam positions better - they were ~0, 0 and 0, +1 in BPM A and B (x and y).

    00:56 Changed to test #6 with free clock, 240Hz, TStable 4066.65.

    01:39 Request 10 uA.

    02:03 Moved from PbD #3 to #2 and back to #3 b/c we forgot to do a test with raster not synched (w/ 50uA).

    02:46 Have moved to PdD#2, Decision is made to run with 240Hz, free clock, Octet overnight, waiting for beam to come back. 2 cavities in N. linac have failed; estimate 8 minutes.

    03:08 Beam back and at 50 uA after checking beam positions and spot_L.

    03:36 Completed BCM calibration run, setting up for production; adjusting HV settings for detectors and LUMIs.

    03:50 Start of first production run.

    07:00 Frequent CODA/ROC crashes...

    07:48 Hear animal sounds in the stairwell... Ron heard it on the roof.

    08:00 Shift ends....Hand off to next crew.


    Runs Taken

    
    Test Runs*
    
    Parity   Beam Current   
    Run #     (µA)
    ----     ------------ 
    3502       50           
    3503       50         Detector HV changes
    3504       50         has detector HV changes, 240Hz line synch, correct
    pedestals 
    3505       50         free clock, 240Hz octet, TStable 4066.65 us
    3506       10         free clock, 240Hz octet, TStable 4066.65 us
    3507       50                 
    3508       50         raster not synched
    3509       50 
    3510                  coda issues
    3511                  coda issues
    3512       50         same as 3505 except on PbD #2  
    3513       50         ramping the beam current for BCM calibration
    3514       50         adjusting HV
    3515       50         adjusting HV              
    
    

    *This is just a rough summary; see Bob's log entries for details.

    Production Runs Parity Beam Current Run # (µA) ---- ------------ 3516 50 3517 50 coda crash 3518 50 coda crash 3519 50 3520 50 3521 50 coda crash 3522 50 coda crash 3523 50 3524 50 3525 50 coda/ROC crash 3526 50 coda/ROC crash 3527 50 coda/ROC crash 3528 50 3529 50 3530 50 started...