keyword=Run Coordinator Daily Summary, May 5 Swing - May 6 Day
Summary for May 5 Swing - May 6 Day
- Raster clock tests start of owl
- Beam studies during day shift
- End beam studies with CHL trip
24 Hour beam time summary
- ABU: 12.17
- BANU: 1.42
- BNA: 10.41
Accumulated charge summary
- Last 24 hours: 280 mC
- Total: 21.5 C
Main events/issues:
- Raster clock tests inconclusive
- Leakly upstream chicane vacuum valve replaced by vacuum group
- Megan Friend installs Boron around GSO in addition to lead
- Compton cavity work continued through the day shift
Plans for the next few days:
- Additional raster clock tests during swing 5/6
- Finish Compton vacuum work
- Wien angle change, QE scan, and spot move Friday morning
- Continue production
- Q^2, low current cavity tests likely over the weekend (Bob)
- Moller Saturday?