• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Armstrong

    Log entry time 08:51:04 on May 12, 2010

    Entry number 322345

    keyword=Access update

    MCC calls; the survey of the hall is complete. The area near the septum magnet (properly, the septa magnets) is 1.5R whole body dose, and 4R on contact, so we need a designated radiation watch person. Lorenzo Zana has been trained in this, and is on shift at present, so he can take this on initially.

    I call Ed and tell him.

    I learn that my previous log entry was incorrect; Ed cannot work on the scattering chamber vacuum issue since beam was run on the Pb target overnight, so the scattering chamber area is too hot for work (see above). The plan for this access is to work on the left dipole P/S and the right dipole NMR.

    I will call Abdurahim and see if he wants to go in for Compton work.