• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name techs

    Log entry time 15:04:34 on May 14, 2010

    Entry number 322518

    Followups:

    keyword=checklist

    the teach on call at startup is Howard Sieves positions are in the out position left collimator is out right collimator is out left arm inner red beacon on power supply platform is out right arm inner and outer red beacon are out right arm Q2 and Q3 read back for epics soft where shows magnets are off and power supply is on still working on left Q3