User name zana
Log entry time 00:06:12 on June18,2010
Entry number 327141
keyword=Swing Shift Summary
04:00 pm Vacuum pressure at 6 x10^(-5) mbar
04:35 pm Vacuum pressure at 2.5 x10^(-5) mbar
04:45 pm Vacuum stable at ~ 2.3 x10^(-5) mbar J.P. Chen called and he is starting the cool down
07:15 pm Target cooling down completed
07:18 pm Returning temperature from loop #2 for the target cooling went over 30K, just after had gone down to 24K. Our upper limit is 30K and J.P. Chen suggested to wait a couple of hours to see if the temperature stabilizes
07:30 pm Called Jack Segal who started to ramping up the magnets for the left and right arm
10:00 pm magnets for left and right arm seem to be stable
11:30 pm MCC ready to deliver beam to the Hall. We are trying now to establish 70uA beam with empty target