• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name paschke

    Log entry time 15:26:09 on June 18, 2010

    Entry number 327352

    This entry is a followup to: 327343

    keyword=run list during adc gain / pedestal change

    File Edit Options Buffers Tools Help

    On Owl 6/18, Bob modified gains of CH ADCs, but pedestals were not remade. This change was used for runs 4645-4659.

    After Run 4659, modified to go back to "50uA" adc gains. Run 4661-4663 were done with the same (50uA) gains that had been used since late April, I think.

    Then Luis cam in a tweeaked gains to allow headroom for the bcms for 50uA. This covered runs 4664-4666. He then set the pedestals using a beam ramp in run 4667.

    Run 4668 and on are production with the new bcm gains and bcm pedestals.