• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name N Toro

    Log entry time 18:41:35 on July 3,2010

    Entry number 329740

    Followups:

    keyword=beam on dump at 67.5, beginning high-current permanent magnet temperature test

    MCC verified beam on dump viewer (temperature has dropped to 62.5 degrees from 67.5 after 18 minutes with beam off or empty target).

    We are moving to Pb/C #1, will watch temperatures with 25 uA on target to see if they stabilize or how quickly they reach 120 degrees.