• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name ejensen

    Log entry time 16:44:11 on July10,2010

    Entry number 331348

    keyword=Shift in coincidence peak

    A shift in the t1 coincidence peak was observed in runs 1851 and 2026 (1st plot). There was initially a suspicion that this shift may be due to the higher beam current. It was soon realized that t6 was setup as a singe arm trigger for run 1851, which probably accounts for the shift. A low current run was taken anyway and the results are shown in he 2nd plot. There appears to be no shift in the peak due to lower rates.


    FIGURE 1

    FIGURE 2