    keyword=RQ1 back up, Hall C completing their invasive test until 3am

    RQ1 is back up. Heidi swapped the previous control board back in (since it doesn't seem to be the problem) so we can turn the regulation back on and presumably hit the same operating point as before. (We will confirm this shortly.)

    Hall C began their invasive test plan at around midnight. This is an opportunistic shift of the original plan which had it scheduled from 0600--0900. They will continue their study until 3am (at the latest) at which point we will restart production running.