The RQ3 power supply transistor banks have been removed and installed in the LQ3 power supply. The LQ3 power supply transistor banks have been removed and are being stored in the trailer. All solder connections were replaced with solderless terminals in both power supplies. The LCW lines were replaced on both arms.