Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Jin Huang
Log entry time 23:49:49 on October 7,2010
Entry number 333904
keyword=Target Screen 6
Hall C 15K flow has been dropping. Seem done by ESR. But both supply and return temperature still remain high. Target loop temperature has also been stable.
Current status:
Loop1: 28K
Loop2: 71K
15K sup.: 18K
20K ret.: 33K
My suggest to Owl target operator to watch:
1. 20K return temperature (CTD674): stable and <~40K
2. Loop 1 temperature (haL1_Cernox_1/2/3_R): stable. Could close loop1 JT valve a little if it drop <19K.
FIGURE 1
FIGURE 2