Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Carlos
Log entry time 08:10:07 on October 9,2010
Entry number 334028
keyword=Owl shift summary
We asked for restricted access at the beginning of the shift, as the target cooldown had finished. While lock-up was taking place, we took cosmics on the calorimeter to test new firmware.
We got beam around 1:30, checked on Be0 and C-hole, with different raster sizes.
We took a 1h-long run on the optics target at 10uA (when I tried to increase the current to a higher value, MCC realized there was an operational restriction to 1uA on the optics target).
We moved to LH2 (LOOP 2, not Loop 1 as in the target GUI). Checked raster, and started taking data with and without sieve.
Smooth data taking at the end of the shift.
Runlist
=========
7064: Raster 2x2 on C-hole
7066: Raster 5.5x4 on C-hole
7067: Multifoil target
7068: Raster 5.5x4 on LH2
7069; Raster 7x7 on LH2
7071: Sieve OUT, LH2, 10uA
7072: Sieve IN, LH2, 10uA
7073: Sieve IN, LH2, 10uA