We have finished three hours of runs with left hrs at 37 deg (p_central as 2.406 GeV/c). Now the plan is to do target boiling study. We are preparing that: we are moving the lhrs from 37 deg to 25 deg (with p_central as 2.0 GeV/c). Since we are marching towards low momentum setting, no Q2 or Q3 recycling required. The boiling study may take about 5 hours once it starts.