Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name efuchey
Log entry time 11:27:22 on October 26, 2010
Entry number 336810
This entry is a followup to: 334812
Followups:
keyword=Compton beamline
For 4 pass3s, the compton beamline has been modified in such a way:
- the 6mm collimator has been replaced by the 10mm collimator;
- 1 out of the 3 mm of lead filter has been removed.