    Cryo is warming up the Moeller N2 circuit. The He Dewar control point has been lowered to 20% in preparation for warm up on Monday.

    CLOG Entry: 1558775

    Hall A moeller buffer dewar inlet valve has been set to -8/-8, as the Hall is finished with it. LN2 valves have also been set to -20/-20. Will likely leave the Hall A warm return on ESR suction for the weekend and switch it to CHL recovery on Monday, as the buffer dewar will start to go empty around that time.