    User name efuchey

    Log entry time 15:13:50 on December19,2010

    Entry number 345179

    keyword=Target change

    Moved from Loop 2 TO Loop 1. Fan frequencies have modified properly, and Loop 1 J/T valve has the good setting. Loop 2 J/T valve still has to be closed a little bit, but we wish to maximize data taking.