As noted earlier, the Right HRS is now connected to the BigBite weldment with the faster RG8 cables. The L1A from the weldment has been delayed approximately 64ns before entering the RT module, approximately 70ns before the RT/strobe signal (which is S1 OR S2).
Unfortunately, no gates are being created by the Transition Module. The speculation is that we are missing an ECL-Twinax connector to connect the L1AO signal to the TM. It is likely that such a cable will need to be found or made before any usable data can be extracted from the right arm, unless we decide to bypass the TM.