The checklist is complete and the target and spectrometer guards are removed
Tech on call at startup is Jessie Butler
Techs are to be called for emergencies only
Hand is behind Big Bite
The lead wall is install in front of Hand
Both spectrometer sieves are out
Target chamber vacuum is <1X10-6
Left spectrometer is in positive polarity