NEXT
Make New Entry,
Make Followup Entry
User name V. Sulkosky
Log entry time 21:10:04 on February 17, 2011
Entry number 347393
keyword=D-threshold Timing Information and setup
Times to get from target to point at which EDTM is injected
Proton or Deuteron into L-HRS:
0.490 0.968 0.930 GeV/c
------------------------------------
0.463 0.718 0.444 Beta
Proton Proton Deuteron
173 112 180 TOF
60 60 60 Signal cable from PMT
--- --- ---
233 ns 172 ns 240 ns
Electron into R-HRS:
87 TOF
60 Signal cable from PMT
---
147 ns
Time difference between proton and electron signals to EDTM injection point:
0.490 0.968 0.930 GeV
------------------------------
L-B = 86 25 93
With these numbers, we can use one setting for the delays: 93-25 = 68,
68/2 = 34 or centered at 59 ns from the faster proton.
For the time being, I will keep the delay settings from the neutron
efficiency run:
t1_delay 128 8
since they were fine for both elastic protons and the neutron running.
However, I would like to check the EDTM timing versus the real
coincidences and perhaps do a scan of the delay to verify that everything
is fine.
A copy of this log entry has been emailed to: doug,kelleher,danez,lselvy,brads