    keyword=D-threshold Timing Information and setup

     Times to get from target to point at which EDTM is injected
    
     Proton or Deuteron into L-HRS:
    
     
        0.490    0.968     0.930  GeV/c
       ------------------------------------
        0.463    0.718     0.444   Beta
       Proton   Proton    Deuteron
        173      112       180     TOF
         60       60        60     Signal cable from PMT
        ---      ---       ---
        233 ns   172 ns    240 ns
    
     Electron into R-HRS:
    
    
      87       TOF
      60       Signal cable from PMT
     ---
     147 ns
    
     Time difference between proton and electron signals to EDTM injection point:
    
    
          0.490    0.968     0.930  GeV
          ------------------------------
    L-B =   86       25        93
    
    
    With these numbers, we can use one setting for the delays: 93-25 = 68,
    
    68/2 = 34 or centered at 59 ns from the faster proton.

    For the time being, I will keep the delay settings from the neutron efficiency run:

    t1_delay 128 8
    since they were fine for both elastic protons and the neutron running. However, I would like to check the EDTM timing versus the real coincidences and perhaps do a scan of the delay to verify that everything is fine.