• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name J. Zhang

    Log entry time 16:44:06 on February18,2011

    Entry number 347506

    keyword=Day shift summary

    R. Lindgren SL
    Experiment on hold until Moller measurments are made.
    Expect to take most of the shift.

    10:00 Fkammable gas alerm system started to alarm, Called Jack and he came to reset it.

    12:00 Moller DAQs lost signal. Ask for escorted access.
    12:30 There power stripe of the moller crate has no power.
    Moller nim modules are now connected to other power source. But the problem is still there.

    16:00 moller is going on