• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name lselvy

    Log entry time 08:35:28 on February23,2011

    Entry number 348230

    keyword=Shift Summary

    At the beginning of the shift an escorted access was taken to remove the sieve slit on the right arm. When that was completed we changed over to the LD2 target and ran most of the night. Beside a few ROCs hanging up every now and then, it was a quiet shift. At 6:45 we shifted over to take 15 minutes on the 15cm Al dummy before calling for a full survey controlled access.

    1742 - 1743 35 uA Production
    1744 Run was stopped due to a mysterious low rate in the right arm
    1745 Production continued, ROC 10 hung up and rebooted
    1746-1747 Coda was restarted junk runs
    1748 - 1749 35 uA Production
    1750 BBTS1 hung and was reset usnig hareboot30
    1752 35 uA production
    1753 presclae issue after changing back to the 15cm Al dummy
    1754 20 uA on the 15cm Al dummy

    Once the runs were finished a controlled access was called for.