Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name lselvy
Log entry time 08:35:28 on February23,2011
Entry number 348230
keyword=Shift Summary
At the beginning of the shift an escorted access was taken to remove the sieve slit on the right arm. When that was completed we changed over to the LD2 target and ran most of the night. Beside a few ROCs hanging up every now and then, it was a quiet shift. At 6:45 we shifted over to take 15 minutes on the 15cm Al dummy before calling for a full survey controlled access.
1742 - 1743 35 uA Production
1744 Run was stopped due to a mysterious low rate in the right arm
1745 Production continued, ROC 10 hung up and rebooted
1746-1747 Coda was restarted junk runs
1748 - 1749 35 uA Production
1750 BBTS1 hung and was reset usnig hareboot30
1752 35 uA production
1753 presclae issue after changing back to the 15cm Al dummy
1754 20 uA on the 15cm Al dummy
Once the runs were finished a controlled access was called for.